Design checks for seismic event for C4, Propylene, Ethylene
Steel Tanks in based on API 620/650 (Cilengon Line Project, 10,000 ~ 90,000m3)
2022
2021
Design checks for temporary openings
2021
2021
Spillage & Seismic & AfterShock for LNG Tank
at Kwangyang in Korea (200,000m3)
2021
2020
Design checks for Dangjin LNG Tank in Korea (270,000m3)
2020
2019
Section Optimization Project with LUSAS Tank System
2019
2018
LPI development for automatic modeling of
Membrane Tank System
2018
2018
Full Staged Construction with Creep&Shrinkag for Jeju Aewol LNG Membrane Tank in Korea (50,000m3)
2018
2017
Spillage & Seismic & AfterShock for Al-Zour LNG Tank in Kuwait (225,000m3)
2017
2016
Seismic with TFPB isolator for Costa Norte LNG tank in Panama (180,000m3)
2016
2015
Aftershock analysis for Kwangyang LNG Storage Tank (200,000m3)
2015
2014
Spillage Analysis of LPG Tank (200,000m3)
2014
2013
Stability Examination on LNG Steel Storage tank in Japan
2013
2013
Design of Hangzhou LNG Tank (11,700m3)
2013
2012
BCP analyzes for Dragon LNG terminal Milford (100,000m3)
2012
2012
Design of Zhejiang LNG Storage Tank (165,000m3)
2012
2011
Samcheok LNG Terminal Phase III Project (270,000m3)
2011
2010
Design of Singapore LNG Terminal
(180,000m3)
2010
2010
Design of Kwangyang LNG Terminal (165,000m3)
2010
2009
Singapore LNG terminal Design Competition (180,000m3)
2009
2008
Design of Thailand LNG Storage Tank
(173,000m3)
2008
2005
Pump Platform
2005
2004
Detailed Design of LNG Storage Tanks (200,000m3)
2004
2001
LNG Loading Arm
2001